Traffic Advice

Temporary Traffic Arrangements in Ap Lei Chau

               Motorists are advised that the following temporary traffic arrangements will be implemented in Ap Lei Chau during the period stipulated below between 19 and 26 May 2012 to facilitate the construction of MTRCL South Island Line (East):

A. From 8.30 p.m. to 6.30 a.m. of the following day

Traffic Diversions
1. Lee King Street will be converted from one-way westbound to one-way eastbound.
2. Vehicles from Lee Hing Street eastbound heading for Lee Nam Road will be diverted to travel via Lee Lok Street.

B. From 11.00 p.m. to 6.00 a.m. of the following day

Road closure
The section of Lee Nam Road between Lee Hing Street and Lee King Street will be closed to all vehicular traffic.

Traffic Diversions
1. Vehicles from Lee Nam Road southbound will be diverted to travel via Lee Hing Street eastbound and Lee Lok Street.
2. Vehicles from Lee Nam Road northbound will be diverted to travel via Lee King Street and Lee Hing Street (westbound).

                 Appropriate traffic signs will be provided on site to guide motorists.