Traffic Advice

Temporary Traffic and Transport Arrangements on Lung Cheung Road, Wong Tai Sin

 

     Members of the public are advised that to facilitate the water mains works, the following temporary traffic and transport arrangements will be implemented in Wong Tai Sin District from 10.00 pm to 6.00 am on the following day during the period from 25 March 2015 to 27 March 2015, and from 8 April 2015 to 23 April 2015:-

(A)  Temporary Traffic Arrangement

I. Banning of Turning Movement
  All vehicles will be temporarily prohibited from making left-turn from Hammer Hill Road southbound onto Lung Cheung Road eastbound.
   
II. Traffic Diversion
  Affected vehicles will be diverted via Hammer Hill Road southbound, slip road, Lung Cheung Road westbound, slip road, Po Kong Village Road northbound, Tai Hom Road eastbound and Lung Cheung Road eastbound.
 

(B)  Temporary Transport Arrangement

   KMB Route Nos. 3M (Choi Wan bound), 10 (Choi Wan bound), 91 (Clear Water Bay bound), 91M (Po Lam bound), 92 (Sai Kung bound) and New Territories GMB Route Nos. 1 (Sai Kung bound), 1A (Sai Kung bound) and 11 (Hang Hau bound) will be diverted via Hammer Hill Road southbound, slip road, Lung Cheung Road westbound, slip road, Po Kong Village Road northbound, Tai Hom Road eastbound and Lung Cheung Road eastbound, and resume to its original routeing.
 

     Appropriate traffic signs will be erected on site to guide motorists. KMB and GMB operator will post up notices to advise passengers of the above temporary arrangements.