TRAFFIC ADVICE
Members of the public are advised that to facilitate road resurfacing work, the following temporary traffic and transport arrangements will be implemented from 9.00 pm to 6.00 am of the following day on 25, 26, 28 January and 1, 2, 4 February 2016:
A. Traffic Diversion
The section of Tai Hang Road from a point about 110 metres north of its junction with Tai Hang Drive to a point about 260 metres north of the same junction will be converted to one-lane-two-way traffic.
B. Bus and Green Mini Bus (GMB) stops arrangement
The following bus and GMB stops will be temporarily suspended or relocated:
Route Nos. |
Suspended Stops |
Relocation Arrangement |
CTB 11 and 41A GMB 21M |
Tai Hang Road southbound outside Wang Fung Terrace |
The concerned stops will be relocated backward for about 60 metres |
CTB 11 and 41A GMB 21M |
Tai Hang Road northbound near Tai Hang Road Rest Garden |
The concerned stops will be relocated backward for about 80 metres |
Appropriate traffic signs will be erected on site to guide motorists. The public transport operators will display notices at the stops to advise passengers of the above temporary arrangements.