Temporary Traffic and Transport Arrangements in Wan Chai

    Members of the public are advised that the following temporary traffic and transport arrangements will be implemented in Wan Chai from 2.00 a.m. to 5.00 a.m. daily on 4 and 5 February 2016 to facilitate the emergency drainage works in connection with the Shatin to Central Link:

A. Temporary Road Closure

The second exit road leading from Cross-Harbour Tunnel Portal to Causeway Bay / Tai Hang will be temporarily closed to all vehicular traffic.

B. Traffic Diversion

During the road closure period, the following temporary traffic diversions will be implemented:

(i)   to Causeway Bay / Tai Hang direction: via the first exit road leading from Cross-Harbour Tunnel Portal to North Point, Victoria Park Road eastbound, Wing Hing Street, Electric Road, Hing Fat Street, Tsing Fung Street, Victoria Park Road westbound, Gloucester Road westbound, Paterson Street, Great George Street and Gloucester Road elevated road.

(ii) to Causeway Bay direction: via the slip road leading to Gloucester Road westbound, Tonnochy Road northbound, Hung Hing Road eastbound, Wan Shing Street southbound, Wan Ying Street, Marsh Road elevated road southbound, Lockhart Road eastbound, Percival Street southbound, Hennessy Road eastbound, Yee Wo Street eastbound, Sugar Street eastbound and Gloucester Road northbound.

C. Bus and GMB Route Diversion

During the road closure period, affected Cross-Harbour Tunnel bus route nos N11, N170 and N171 and Green Minibus route no. 49S heading to Causeway Bay direction will be diverted to travel via the slip road leading to Canal Road Flyover southbound, Canal Road Flyover southbound, Canal Road East, Canal Road West, Canal Road Flyover northbound, Hung Hing Road Flyover eastbound and Victoria Park Road eastbound before resuming their normal routeings.