TRANSPORT DEPARTMENT NOTICE
Temporary Traffic and Transport Arrangements in Tsz Wan Shan

     Notice is hereby given that in connection with the construction of Shatin to Central Link, the following temporary traffic and transport arrangements will be implemented in Tsz Wan Shan from 11.00 p.m. to 5.00 a.m. daily from 18 June 2016 to 2 July 2016:

     A. Temporary Road Closure

     The traffic lane of Wan Wah Street (southbound) south of Wai Wah Street will be temporarily closed to all vehicular traffic.

     B. Banning of left-turn vehicular movements

     All vehicles will be temporarily banned from making left turn movements from Wai Wah Street onto Wan Wah Street (southbound).

     C. Traffic Diversions

     i. Affected vehicles on Wan Wah Street (southbound) heading for Shung Wah Street and Sheung Fung Street will be temporarily diverted via Wai Wah Street (eastbound), Tsz Wan Shan Road (eastbound), Yuk Wah Street (westbound), Wan Wah Street (southbound), Shung Wah Street (westbound) and Sheung Fung Street (northbound); and

     ii. Affected vehicles on Wai Wah Street (westbound) heading for Shung Wah Street and Sheung Fung Street will be temporarily diverted via Wan Wah Street (northbound), Tsz Wan Shan Road (eastbound), Yuk Wah Street (westbound), Wan Wah Street (southbound), Shung Wah Street (westbound) and Sheung Fung Street (northbound).

     D. Temporary GMB Route Diversion

     GMB route no. 37A heading to Wong Tai Sin Station will be temporarily diverted via Wai Wah Street (eastbound), Tsz Wan Shan Road (eastbound), Yuk Wah Street (westbound), Wan Wah Street (southbound) and Shung Wah Street (westbound) before resuming its normal routing on Sheung Fung Street (southbound).

     Appropriate traffic signs will be provided on site to guide motorists. The public transport operator will arrange publicity to advise passengers of the above arrangements.

YEUNG HO Poi-yan, Ingrid Commissioner for Transport