Traffic Advice

Traffic Arrangement in To Kwa Wan

        Motorists are advised that in connection with the construction of Shatin to Central Link, one northbound traffic lane will be reinstated on the section of Ma Tau Wai Road between Chi Kiang Street and Lok Shan Road from 1.00 pm on 16 September 2017.

        Appropriate traffic signs will be set up on site to guide motorists.