Traffic Advice

Temporary Traffic and Transport Arrangements on Hung Tin Road, Yuen Long

        Motorists are advised that in order to facilitate resurfacing works, the following temporary traffic and transport arrangements will be implemented from 9.00 pm to 6.00 am the following day on 9, 10 and 11 October 2017:

I.   Traffic Arrangement

(a)  Road Closure

The slip road leading from Hung Tin Road southbound to Yuen Long Highway westbound will be temporarily closed to all vehicular traffic

(b)  Traffic Diversion

I.  Affected motorists on Hung Tin Road southbound heading for Yuen Long Highway westbound will be diverted via Hung Tin Road southbound, Castle Peak Road - Hung Shui Kiu westbound and Castle Peak Road - Lam Tei westbound; or

II. Affected motorists on Hung Tin Road southbound heading for Yuen Long Highway westbound will be diverted via slip road, Yuen Long Highway eastbound, slip road, Long Tin Road northbound, U-turn of slip road, Long Tin Road southbound, Tong Yan San Tsuen Interchange and Yuen Long Highway westbound.

II.  Public Transport Arrangement

(a)  Bus Diversion

LWB Route Nos. N30, N30S (Tung Chung Bound) and NLB Route No. B2P (Shenzhen Bay Port Bound) will be diverted via Hung Tin Road southbound, Castle Peak Road - Hung Shui Kiu westbound and Castle Peak Road - Lam Tei westbound, and then resume their original routeings.

        Appropriate traffic signs will be erected on site to guide motorists. Public transport operators will put up notices to advise passengers of the above arrangements.