Traffic Advice

Temporary Traffic Arrangements in Jordan

        Motorists are advised that to facilitate the construction of Guangzhou-Shenzhen-Hong Kong Express Rail Link, the following temporary traffic arrangements will be implemented from 12.00 midnight to 5.00 am on 21 November 2017:

Temporary Banning of Vehicle Turning Movement and Traffic Diversions
        The right turn movement for all vehicles from Lin Cheung Road (southbound) onto Jordan Road (westbound) will be banned.  Affected vehicles will be diverted to travel via Lin Cheung Road (southbound), Jordan Road (eastbound), Road D1A(S) (southbound), Wui Cheung Round (eastbound), Canton Road (northbound) and Jordan Road (westbound).

        Appropriate traffic signs will be erected on site to guide motorists.