Traffic Advice

Extension of Temporary Traffic Arrangement on Kwai Luen Road, Kwai Chung

        Motorists are advised that to facilitate water-mains works, the slip road connecting Kwai Luen Road (westbound) and the carpark of Kwai Shing West Estate will continue to be closed to all vehicular traffic from 6:01 p.m. on 28 November 2017 to 6:00 p.m. on 16 December 2017.

        During the above road closure period, vehicle on Kwai Luen Road (westbound) heading to the carpark of Kwai Shing West Estate will be diverted to travel via Kwai Luen Road (northbound), Kwai Shing Circuit (southbound), Kwai Shing Circuit (eastbound), Hing Shing Road (westbound), Kwai Fuk Road (northbound), Shing Fuk Street (eastbound), Kwai Shing Circuit (northbound) and Kwai Luen Road (southbound).

        Motorists are advised to drive with utmost care and patience.  Appropriate traffic signs have been erected on site to guide motorists.