Traffic Advice

Temporary Traffic Arrangements on Choi Hung Road, Diamond Hill

        Members of the public are advised that in connection with the construction of Shatin to Central Link, the following temporary traffic arrangements will be implemented in Diamond Hill from 1.30 am to 6.00 am on 21 December 2017:

Temporary banning of vehicular movements and traffic diversions

i. All vehicles will be temporarily banned from making right turn movements from Choi Hung Road (eastbound) onto Choi Hung Road (southbound).

Affected vehicles on Choi Hung Road (eastbound) heading for Choi Hung Road (southbound) will be temporarily diverted via Hammer Hill Road (eastbound), roundabout, Hammer Hill Road (westbound) and Choi Hung Road (southbound).

ii. All vehicles will be temporarily banned from making right turn and straight ahead movements from Choi Hung Road (northbound) onto Choi Hung Road (eastbound) and slip road to Lung Cheung Road respectively.

Affected vehicles on Choi Hung Road (northbound) heading for Choi Hung Road (eastbound) and slip road to Lung Cheung Road will be temporarily diverted via Choi Hung Road (westbound), Choi Yee lane (westbound), Sze Mei Street (northbound) and Choi Hung Road (eastbound).

        Appropriate traffic signs will be provided on site to guide motorists.