Transport Department Notice
Temporary Traffic and Transport Arrangements on Fanling Highway, Tai Po and North District
Notice is hereby given that to facilitate the road works on Fanling Highway, the following temporary traffic and transport arrangements will be implemented from 13 March 2018 to 17 March 2018:
(I) ROAD CLOSURE
from 1.00 am to 6.00 am on 13, 14, 15, 16 and 17 March 2018
a) The section of Fanling Highway northbound from its junction with Tolo Highway to its junction with the slip road leading from Hong Lok Yuen Road; and
b) Two traffic lanes of Fanling Highway northbound from its junction with the slip road leading from Hong Lok Yuen Road to a point about 50 metres south of Ho Ka Yuen Footbridge will be closed to all vehicular traffic.
(II) TRAFFIC DIVERSION
from 1.00 am to 6.00 am on 13, 14, 15, 16 and 17 March 2018
Vehicles on Tolo Highway or Tai Po Road - Tai Wo northbound heading for Fanling and Sheung Shui will be diverted via Lam Kam Road Interchange, Tai Po Road - Tai Wo northbound, slip road and Fanling Highway northbound.
(III) PUBLIC TRANSPORT SERVICES ARRANGEMENTS
from 1.00 am to 6.00 am on 13, 14, 15, 16 and 17 March 2018
a) Franchised Bus Services
KMB route nos. 270A (Sheung Shui bound), 270S (Luen Wo Hui bound), 277E (Tin Ping Estate Bound), 277X (Luen Wo Hui bound), 278X (Sheung Shui bound) and LWB route no. N42A (Luen Wo Hui bound) will be diverted via Lam Kam Road Interchange, Tai Po Road - Tai Wo northbound and slip road before resuming its normal routing.
b) Green Minibus Services
GMB Route no. 501S (Sheung Shui bound) and 616S (Lok Ma Chau bound) will be diverted via Lam Kam Road Interchange, Tai Po Road - Tai Wo northbound and slip road before resuming its normal routing.
Appropriate traffic aids will be erected on site. Motorists are advised to follow the instructions on site and drive in utmost care.
CHAN Mable Commissioner for Transport