Traffic Advice

Temporary Traffic and Transport Arrangements on Austin Road West, Tsim Sha Tsui

        Motorists are advised that in order to facilitate infrastructure works at the slip road connecting Austin Road West westbound (near Xiqu Centre) and Austin Road West Eastbound in Tsim Sha Tsui, the following temporary traffic and transport arrangements will be implemented from 7.00 a.m. to 12.00 noon on 13 May 2018, 20 May 2018, 27 May 2018 and 3 June 2018 respectively:

A.    Road Closure

The slip road connecting Austin Road West westbound (near Xiqu Centre) and Austin Road West eastbound in Tsim Sha Tsui will be temporarily closed to all vehicular traffic.

B.    Traffic Diversion

During the above period, motorists on Austin Road West westbound heading to Austin Road West eastbound will be diverted to travel via Austin Road West westbound, roundabout connecting Austin Road West and Nga Cheung Road and, Austin Road West eastbound.

C.    GMB Route no. 6 and 6C Diversion

During the above period, vehicles of GMB route no. 6 and 6C on Canton Road northbound heading to Hung Hom will be diverted to travel via Canton Road northbound, Wui Cheung Road westbound, Wui Cheung Road eastbound and Canton Road southbound before resuming to normal routeing.

        Appropriate traffic signs will be erected on site to guide motorists. The public transport operator concerned will display notices to advise passengers of the above arrangements.