Traffic Advice

Temporary Lane Closure of Fanling Highway, Tai Po and North Districts

        Members of the public are advised that to facilitate road works on Fanling Highway, the following temporary traffic arrangements will be implemented from 22 June 2018 to 30 June 2018:

1. from 11.30 pm to 5.30 am of the following day on 22, 28 and 29 June 2018

The slow lane of Fanling Highway northbound from a point about 50 metres south of Nam Wa Po Footbridge to a point about 50 metres south of Ho Ka Yuen Footbridge will be closed to all vehicular traffic.

2. from 11.30 pm to 6.00 pm of the following day on 23 June 2018

The fast lane of Fanling Highway northbound from a point about 50 metres south of Nam Wa Po Footbridge to a point about 50 metres south of Ho Ka Yuen Footbridge will be closed to all vehicular traffic.

3. from 11.30 pm to 5.30 am of the following day on 25, 26 and 27 June 2018

The fast lane of Fanling Highway northbound from a point about 50 metres south of Nam Wa Po Footbridge to a point about 50 metres south of Ho Ka Yuen Footbridge will be closed to all vehicular traffic.

        Appropriate traffic aids will be erected on site. Motorists are advised to follow the instructions on site and drive in utmost care.