Motorists are advised that in order to facilitate road inspection and maintenance works, the following temporary traffic arrangements will be implemented during the periods specified below:
Road Closure Implementation Date and Time |
Temporary Traffic Arrangement |
From 9.00am to 6.00pm on 10, 11, 12, 17, 18, 19, 20, 21 and 22 October 2022 |
Fast lane and middle lane of Hong Kong bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic. |
From 8.00pm to 6.00am of the following day on 13, 14 and 15 October 2022 |
The Zhuhai bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic; and one-tube-two-way operation will be implemented at the Hong Kong bound tunnel tube. |
Appropriate traffic signs will be erected on site to guide motorists.