Traffic Advice
Temporary Traffic Arrangements in Tai Wo Interchange, Kwai Chung


        Members of the public are advised that to facilitate road works, the following temporary traffic arrangements will be implemented in the section of Tai Wo Interchange (Northbound) between Wah King Hill Road (Northbound) and Castle Peak Road – Kwai Chung (Southbound) from 10.00 a.m. on 16 December 2022 to 6.00 p.m. on 22 February 2023 –

(I) Temporary Traffic Arrangement

    • All vehicles exceeding 8 metres in length will be temporarily prohibited from entering the section of Tai Wo Interchange (Northbound) between Wah King Hill Road (Northbound) and Castle Peak Road – Kwai Chung (Southbound);

(II) Temporary Traffic Diversion

    • Affected vehicles on Wah King Hill Road (Northbound) heading for Castle Peak Road – Kwai Chung (Southbound) will be diverted to travel via Tai Wo Interchange (Westbound), Tai Wo Interchange (Northbound), Castle Peak Road – Kwai Chung (Northbound), Kwok Shui Road (Eastbound) and Cheung Wing Road (Southbound); and
    • Affected vehicles on Tai Wo Interchange (Eastbound) heading for Castle Peak Road – Kwai Chung (Southbound) will be diverted to travel via Wah King Hill Road (Southbound), Wah King Hill Road (Eastbound), Wah King Hill Road (Northbound), Wah King Hill Road (Southbound), Wah King Hill Road (Westbound), Wah King Hill Road (Northbound), Tai Wo Interchange (Westbound), Tai Wo Interchange (Northbound), Castle Peak Road – Kwai Chung (Northbound), Kwok Shui Road (Eastbound) and Cheung Wing Road (Southbound).

        Motorists are advised to drive with utmost care and patience. Appropriate traffic signs will be erected on site to guide motorists.