TRAFFIC ADVICE
Temporary Traffic Arrangements in Tsim Sha Tsui


        Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented in Tsim Sha Tsui from 11.00 pm to 6.00 am of the following day daily on 16 and 17 February 2023:-

I.       Lane Closure

The following traffic lanes will be temporarily closed to all vehicular traffic:

(i)     The slow lane of Lin Cheung Road Underpass southbound heading for Tsim Sha Tsui from a point about 80 metres south of its junction with Jordan Road to its junction with Austin Road West; and

(ii)    The slow lane of Lin Cheung Road Underpass eastbound heading for Tsim Sha Tsui from its junction with Austin Road West to a point about 280 metres east of the same junction.

II.     Traffic Diversion

Affected vehicles on Lin Cheung Road Underpass southbound heading for Tsim Sha Tsui will be temporarily diverted via Austin Road West westbound, roundabout and Austin Road West eastbound before resuming its original routeing.


        Appropriate traffic signs will be erected on site to guide motorists.