Traffic Advice
Temporary Traffic Arrangements on Kwu Tung Road, Yuen Long

     Motorists are advised that, to facilitate the Kwu Tung North New Development Area works, the following temporary traffic arrangements will be implemented from 6:00 a.m. on 29 June 2023 to 6:00 p.m. on 28 June 2024:

Temporary Traffic Diversion

  1. Affected drivers on Kwu Tung Road to the flyover northbound heading to Castle Peak Road – Chau Tau (Sheung Shui and Yuen Long bounds) will be diverted via the temporary road;
  2. Affected drivers on Castle Peak Road – Chau Tau to the flyover southbound heading to Kwu Tung Road (Kwu Tung South and Ki Lun Tsuen bounds) will be diverted via the temporary road; and
  3. Affected drivers on the slip road connecting Fanling Highway westbound and the flyover (Kwu Tung South and Ki Lun Tsuen bounds) will be diverted via the temporary road.

     Appropriate traffic signs and road markings will be erected on site to guide the motorists. Motorists are advised to follow the instructions on site and drive with utmost care.