Motorists are advised that to facilitate bridge maintenance works, the following sections of Lantau Link will be temporarily closed during the time specified below:
Date and Time |
Location |
Direction |
From 10.00 am to 4.00 pm daily during the period from 29 April to 18 May 2024 (except Sundays and Public Holidays) |
Part of the slow lane on Lantau Link between Ma Wan Viaduct and Kap Shui Mun Bridge (near Lantau Tower) |
Airport bound |
From 10.00 am to 4.00 pm daily during the period from 10 to 31 May 2024 (except Sundays and Public Holidays) |
Part of the slow lane on Lantau Link between Kap Shui Mun Bridge (near Lantau Tower) and Ma Wan Viaduct |
Kowloon bound |
Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided on site to guide motorists.