Traffic Advice
Temporary Traffic Arrangements on
Cheung Tsing Highway and Tsing Sha Highway

       To facilitate road works, motorists are advised that the following temporary traffic arrangements will be implemented on Cheung Tsing Highway and Tsing Sha Highway during the time specified below:

(I) Lane closure

Date and Time


Locations

Direction

From 1.00 am to 5.30 am daily on 8 and 13 May 2025

Parts of the traffic lanes between Cheung Tsing Highway (near Kam Chuk Kok) and Cheung Tsing Highway (near the western entrance of Cheung Tsing Tunnel) will be temporarily closed.

Kowloon Bound

Parts of the traffic lanes between Cheung Tsing Highway (near the western exit of Cheung Tsing Tunnel) and Cheung Tsing Highway (near Kam Chuk Kok) will be temporarily closed.

Airport Bound

From 10.00 pm to 5.30 am of the following day daily on
8 and 13 - 15 May 2025

Parts of the traffic lanes of Tsing Sha Highway (near the western exit of Nam Wan Tunnel) and Cheung Tsing Highway (near Kam Chuk Kok) will be temporarily closed.



(II) Temporary Speed Limit

       During the above works period, the above road sections will be temporarily subject to a speed limit of 50 kilometres per hour.

       Motorists are advised to drive with care and patience when approaching the above road sections. Appropriate traffic signs will be provided on site to guide motorists.