Traffic Advice
Temporary Traffic Arrangements on Shek Kok Road, Tseung Kwan O
Members of the public are advised that to facilitate the road works, the following traffic arrangements will be temporarily implemented on Shek Kok Road, Tseung Kwan O:
A. Banning of Turning Movements
1.
From 10.00 a.m. on 15 May 2025 to 10.00 a.m. on 14 June 2025:
-
- Vehicles of length over 8 meters will be temporarily prohibited from making right turn from Shek Kok Road northbound near Manor Hill into Tseung Kwan O Preliminary Treatment Works; and
- All vehicles will be temporarily prohibited from making left turn from Tseung Kwan O Preliminary Treatment Works into Shek Kok Road southbound.
2. From 10.00 a.m. on 14 June 2025 to 10.00 a.m. on 7 July 2025:
-
- Vehicles of length over 8 meters will be temporarily prohibited from making left turn from Tseung Kwan O Preliminary Treatment Works into Shek Kok Road southbound; and
- All vehicles will be temporarily prohibited from making right turn from Shek Kok Road northbound near Manor Hill into Tseung Kwan O Preliminary Treatment Works.
3.
From 10.00 a.m. on 7 July 2025 to 6.00 p.m. on 30 August 2025:
-
- All vehicles will be temporarily prohibited from making right turn from Shek Kok Road northbound near Manor Hill into Tseung Kwan O Preliminary Treatment Works; and
- All vehicles will be temporarily prohibited from making left turn from Tseung Kwan O Preliminary Treatment Works into Shek Kok Road southbound.
B. Traffic Diversion
Vehicles on Shek Kok Road northbound heading to Tseung Kwan O Water Treatment Works will be diverted via Shek Kok Road northbound, roundabout and Shek Kok Road southbound from 10.00 a.m. on 15 May 2025 to 6.00 p.m. on 30 August 2025.
Appropriate traffic signs will be erected on site to guide motorists.