Traffic Advice
Temporary Traffic Arrangements on Tate's Cairn Highway
Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented:
-
-
The fast lane of Tate's Cairn Highway (northbound) from a point about 230 meters north of its junction with Sha Lek Highway (northbound) to a point about 275 meters south of its junction with Ma On Shan Road (northbound) will be temporarily closed to all vehicular traffic from 10 pm to 6 am of the following day daily from 19 May 2025 to 23 May 2025, and 26 May 2025 to 30 May 2025; and,
-
-
The middle lane of Tate's Cairn Highway (northbound) from a point about 720 meters north of its junction with Sha Lek Highway (northbound) to a point about 275 meters south of its junction with Ma On Shan Road (northbound) will be temporarily closed to all vehicular traffic 01 am to 6.00 am daily from 20 May 2025 to 24 May 2025, and 27 May 2025 to 31 May 2025.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to drive with utmost care and patience.