Traffic Advice
Temporary Traffic Arrangements at Tseung Kwan O Tunnel


        Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented at Tseung Kwan O Tunnel in the following days:

Date

Time

Traffic Arrangement

21 and 22 May 2025 From 12.30 am to 6.00 am daily

Tseung Kwan O Tunnel Tseung Kwan O bound tunnel tube will be temporarily closed

One-tube-two-way operation will be implemented at the Kwun Tong bound tunnel tube


        Motorists are advised to drive with care and patience.  Appropriate traffic signs will be erected on site to guide motorists.