Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented at Tseung Kwan O Tunnel in the following days:
|
Date |
Time |
Traffic Arrangement |
| 21 and 22 May 2025 | From 12.30 am to 6.00 am daily |
Tseung Kwan O Tunnel Tseung Kwan O bound tunnel tube will be temporarily closed One-tube-two-way operation will be implemented at the Kwun Tong bound tunnel tube |
Motorists are advised to drive with care and patience. Appropriate traffic signs will be erected on site to guide motorists.