Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented at the Tseung Kwan O Tunnel and Tseung Kwan O Tunnel Road in the following days:
|
Date |
Time |
Traffic Arrangement |
|
27 May 2025 (Tuesday) |
From 12.30 am to 5.00 am |
One-tube-two-way operation will be implemented at the Kwun Tong bound tunnel tube |
Motorists are advised to drive with care and patience. Appropriate traffic signs will be erected on site to guide motorists.