Traffic Advice
Temporary Traffic Arrangements on Cheung Tsing Highway
To facilitate road works, motorists are advised that the following temporary traffic arrangements will be implemented on Cheung Tsing Highway during the time specified below:
(I) Lane closure
|
Date and Time
|
Locations
|
Direction
|
|
From 1.00 am to 5.30 am on 17 May 2025
|
Parts of the traffic lanes between Cheung Tsing Highway (near Kam Chuk Kok) and Cheung Tsing Highway (near the western entrance of Cheung Tsing Tunnel) will be temporarily closed.
|
Kowloon Bound
|
|
Parts of the traffic lanes between Cheung Tsing Highway (near the western exit of Cheung Tsing Tunnel) and Cheung Tsing Highway (near Kam Chuk Kok) will be temporarily closed.
|
Airport Bound
|
(II) Temporary Speed Limit
During the above works period, the above road sections will be temporarily subject to a speed limit of 50 kilometres per hour.
Motorists are advised to drive with care and patience when approaching the above road sections. Appropriate traffic signs will be provided on site to guide motorists.