Traffic Advice
Temporary Traffic Arrangement on Lung Wan Street, Sheung Shui


Motorists are advised that, to facilitate the lift installation works on the footbridge on San Wan Road near Lung Wan Street, the access road from Lung Wan Street (southbound) to San Wan Road (westbound) will be temporarily closed to all vehicular traffic from 12 a.m. to 5 a.m. on 30 May (Friday), 3 June (Tuesday), 4 June (Wednesday) and 5 June 2025 (Thursday). All vehicles will be temporarily prohibited from making right turn from Lung Wan Street (southbound) to San Wan Road (westbound).

Affected vehicles from Lung Wan Street (southbound) to San Wan Road (westbound) will be diverted via San Wan Road (eastbound), So Kwun Po Road (southbound), So Kwun Po Road roundabout, So Kwun Po Road (northbound) and San Wan Road (westbound).

Appropriate traffic signs will be erected on site to guide motorists.