Motorists are advised that to facilitate drainage works, the following temporary traffic arrangements will continue to be implemented from 6.00 pm on 7 June 2025 to 6.00 pm on 7 August 2025:-
The slip road connecting Yan Yip Street and Hang Yip Street will be temporarily closed to all vehicular traffic.
Affected vehicles on Yan Yip Street heading for Hang Yip Street will be diverted via Yan Yip Street, Wai Yip Street eastbound and Hang Yip Street.
Appropriate traffic signs have been erected on site to guide motorists.