Members of the public are advised that, to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Tai Tong Road from 6.00 a.m. on 19 June 2025 to 6.00 a.m. on 18 October 2025:
The section of Tai Tong Road from lamp post number FC1288 to lamp post number FC1290 will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic.
Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided on site to guide motorists. Notices will be posted by MTR to inform passengers of the above arrangement.