Traffic Advice
Temporary Traffic Arrangements on Tate's Cairn Highway
Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented from 12.01 a.m. to 6. a.m. on 7 and 10 to 14 June 2025 daily:
-
-
- The fast lane of Tate's Cairn Highway (northbound) from a point about 230 meters north of its junction with Sha Lek Highway (northbound) to a point about 860 meters south of its junction with Ma On Shan Road (northbound) will be temporarily closed to all vehicular traffic;
- The middle lane of Tate's Cairn Highway (northbound) from a point about 720 meters north of its junction with Sha Lek Highway (northbound) to a point about 580 meters south of its junction with Ma On Shan Road (northbound) will be temporarily closed; and,
- The slow lane of Tate's Cairn Highway (northbound) from a point about 990 meters north of its junction with Sha Lek Highway (northbound) to a point about 580 meters south of its junction with Ma On Shan Road (northbound) will be temporarily closed.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to drive with utmost care and patience.