Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Tung Tsz Road from 10.00 am to 4.00 pm daily from 23 June 2025 to 27 June 2025.
The section of Tung Tsz Road from a point about 30 meters west of its junction with its junction with Ting Kok Road to a point about 70 meters west of the same junction will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic.
Passengers may take the existing green minibus and residents' services about 40 meters west of the road closure area on Tung Tsz Road.
Appropriate traffic signs will be erected on site to guide motorists.