Traffic Advice
Temporary Traffic Arrangements on Tsing Sha Highway

          To facilitate road works, motorists are advised the following temporary traffic arrangements will be implemented on Tsing Sha Highway from 0.00 am on 2 July 2025 to 6.00 am on 4 August 2025:

    1. Road Closure

          Part of the traffic lanes between the east bridge tower of Stonecutters Bridge and Ngong Shung Road of Tsing Sha Highway (Kowloon bound) will be closed to all vehicular traffic.

    2. Temporary Speed Limit

          The sections of Tsing Sha Highway (Kowloon bound) near Container Port Road South will implement temporary speed limit. The speed limit of the above sections will be temporary adjusted from 80 kilometres per hour to 50 kilometres per hour.

          Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided on site to guide motorists.