To facilitate road works, motorists are advised the following temporary traffic arrangements will be implemented on Tsing Sha Highway from 0.00 am on 2 July 2025 to 6.00 am on 4 August 2025:
1. Road Closure
The sections of Tsing Sha Highway (Kowloon bound) near Container Port Road South will implement temporary speed limit. The speed limit of the above sections will be temporary adjusted from 80 kilometres per hour to 50 kilometres per hour.
Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided on site to guide motorists.