Traffic Advice

Temporary Traffic Arrangement on Sha Ho Road, Sha Tau Kok

           Members of the public are advised that to facilitate drainage works, the section of Sha Ho Road, Sha Tau Kok from a point about 40 metres north of its junction with Shan Tsui Village Road and Sha Tau Kok Road – Shek Chung Au to a point about 365 metres north of the same junction will be temporarily closed to all vehicular traffic from 8 a.m. on 7 July 2025 to 6 p.m. on 30 November 2025.

          Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care