Traffic Advice
Temporary Traffic and Transport Arrangements on Dai Fu Street, Tai Po


        Members of the public
are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Dai Fu Street during the periods as specified below:

        (I)    From 10.00 pm on 16 July 2025 to 6.00 am on 17 July 2025

(a)    Lane Closure

The slow lane of Dai Fu Street northbound from a point about 65 metres north of its western junction with Dai Shun Street to a point about 240 metres north of the same junction will be temporarily closed.

(b)   Suspension of Overnight Goods Vehicle Parking Spaces

The overnight goods vehicle parking spaces on the western kerbside lane of Dai Fu Street northbound from a point about 125 metres north of its western junction with Dai Shun Street to a point about 210 metres north of the same junction will be suspended.

(c)    Public Transport Arrangements


The bus stop of KMB Route No. 75K on Dai Fu Street northbound will be temporarily relocated about 135 metres northwards.

(II)   From 10.00 pm on 21 July 2025 to 6.00 am on 22 July 2025

(a)    Lane Closure

The fast lane of Dai Fu Street northbound from a point about 65 metres north of its western junction with Dai Shun Street to a point about 240 metres north of the same junction will be temporarily closed.

(b)   Suspension of Overnight Goods Vehicle Parking Spaces

The overnight goods vehicle parking spaces on the western kerbside lane of Dai Fu Street northbound from a point about 125 metres north of its western junction with Dai Shun Street to a point about 210 metres north of the same junction will be suspended.

(c)    Public Transport Arrangements


The bus stop of KMB Route No. 75K on Dai Fu Street northbound will be temporarily relocated about 135 metres northwards.

        Appropriate traffic signs will be erected on site to guide motorists. Notices will be displayed by bus company to inform passenger of the above arrangements concerned.