TRAFFIC ADVICE
Temporary Relocation of Metered Parking Spaces at Hillier Street, Sheung Wan

        Motorists are advised that to facilitate construction works, the following metered parking spaces at Hillier Street opposite to Lin Wai Building will be temporarily relocated from 12.01 am on 24 July 2025 to 4.00 pm on 23 November 2025:

    1. 3 metered parking spaces (nos. 3565A and 3566AB) will be temporarily relocated to Mercer Street opposite to Cheong Tai Building; and

    2. 2 metered parking spaces (nos. 3567AB) will be temporarily relocated to Mercer Street outside Chuk On Building.

        Appropriate traffic signs and road markings will be provided on-site to guide motorists.