Traffic Advice
Temporary Traffic Arrangements on Ma On Shan Road, Sha Tin
Motorists are advised that in order to facilitate road works, the following temporary traffic arrangement will be implemented from 00:01 a.m. to 06:00 a.m. on 7 August 2025:
- The fast lane of Ma On Shan Road (northbound) from a point about 100 metres south of its junction with Tate's Cairn Highway (northbound) to a point about 200 metres north of the same junction will be temporarily closed to all traffic; and
- The fast lane and middle lane of Ma On Shan Road (northbound) from a point about 200 metres north of its junction with Tate's Cairn Highway (northbound) to a point about 1,100 metres north of the same junction will be temporarily closed to all traffic.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to driver with care and patience.