Traffic Advice
Temporary Traffic Arrangements on Tsing King Road, Tsing Yi
Motorists are advised that to facilitate lifting works, the following temporary traffic arrangements will be implemented on Tsing King Road from 1.30 a.m. to 5.30 a.m. on 14, 21 and 28 September 2025:
(I) Road Closure
The following road sections will be temporarily closed to all vehicular traffic:
- The slow lane of Tsing King Road northbound from a point about 15 metres south of its junction with Tsing Luk Street to a point about 55 metres south of the same junction; and
- The section of Tsing King Road northbound from a point about 10 metres north of its junction with Tsing Luk Street to a point about 290 metres north of the same junction.
(II) Banning of Turning Movement
- All vehicles will be temporarily prohibited from making left turn from Tsing Luk Street eastbound onto Tsing King Road northbound.
(III) Traffic Diversion
- Affected vehicles on Tsing King Road northbound heading to Tam Kon Shan Interchange will be diverted to travel via Tsing Luk Street, Tsing Yip Street, Fung Shue Wo Road northbound and Tam Kon Shan Interchange;
- Affected vehicles on Tsing King Road northbound heading to Tsing Yi Station will be diverted to travel via Tsing Luk Street, Tsing Yip Street, Fung Shue Wo Road northbound, Tam Kon Shan Interchange and Tsing King Road (near Cheung On Estate); and
- Affected vehicles on Tsing Luk Street eastbound heading to Tsing Yi (North) will be diverted to travel via Tsing King Road southbound, Fung Shue Wo Road roundabout, Fung Shue Wo Road, Tam Kon Shan Interchange and Tsing King Road (near Cheung On Estate).
Appropriate traffic signs will be erected on site to guide motorists.