Traffic Advice
Temporary Traffic and Transport Arrangements on Lei Muk Road, Kwai Chung
Members of the public are advised that to facilitate cable laying works, the following temporary traffic and transport arrangements on Lei Muk Road will be implemented from 8.00 am on 20 October 2025 to 6.00 pm on 2 December 2025:
(I) Lane Closure
- Parts of the traffic lanes of Lei Muk Road near its junction with Kwok Shui Road will be temporarily closed to all vehicular traffic.
(II) Relocation of Taxi Pick-up / Drop-off Point
- The taxi pick-up / drop-off point on Lei Muk Road eastbound opposite to Edwick Industrial Centre, Kwai Chung will be temporarily relocated about 90 metres eastward.
Appropriate traffic signs will be erected on site to guide road users.