Motorists are advised that to facilitate construction works, the following temporary traffic and transport arrangements will be implemented in Kwun Tong from 1.00 am to 5.30 am daily during the period from 3 December 2025 to 4 December 2025.
The following road sections will be temporarily closed to all vehicular traffic:
A section of Tseung Kwan O Road westbound leading from Lin Tak Road southbound will be temporarily closed to all vehicular traffic.
(3) Banning of Turning MovementVehicles will be temporarily prohibited from making right turn from Lin Tak Road southbound onto Tseung Kwan O Road westbound.
(4) Traffic DiversionAffected vehicles on Lin Tak Road southbound heading to Tseung Kwan O Road westbound will be diverted via Lin Tak Road southbound, Tak Tin Street westbound, Kai Tin Road northbound and Tseung Kwan O Road westbound.
(5) Public Transport Arrangements
KMB Route Nos. 98A (Kwun Tong bound), 213M (Lam Tin bound) and 293S (Mei Foo bound) and XHT Route No. N691 (Hong Kong Island bound) will be diverted via Lin Tak Road southbound, Tak Tin Street westbound, Kai Tin Road northbound, Tseung Kwan O Road westbound and then resume original routeing.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to observe the instruction and drive with utmost care. Notices will also be displayed by public transport operator to advise passengers of the above arrangement.