Traffic Advice
Temporary Traffic Arrangement on Sha Lek Highway, Ma On Shan, Shatin

        Motorists are advised that in order to facilitate road works, the following temporary traffic arrangements will be implemented from 1.30 am to 5.30 am daily from 4 December 2025 to 6 December 2025:

A.        Road Closure

      1. The slip road leading from Sha Lek Highway (northbound) to Tate's Cairn Highway (southbound) will be temporarily closed to all vehicular traffic.
B.        Traffic Diversion

      1. Vehicles on Sha Tin Wai Road (northbound) heading to Kowloon East will be diverted via Sha Tin Wai Road (northbound), Siu Lek Yuen Road (eastbound) and Tate's Cairn Highway (southbound); and
      2. Vehicles on Sha Lek Highway (northbound) heading to Kowloon East will be diverted via Tate's Cairn Highway (northbound), Shek Mun Interchange and Tate's Cairn Highway (southbound).

        Appropriate traffic signs will be erected on site to guide motorists.