TRAFFIC ADVICE
Temporary Traffic Arrangements in Hung Hom


        Motorists are advised that to facilitate the funeral, the following temporary traffic arrangements will be implemented from 18 December 2025 to 19 December 2025:

        Road Closure

The following road sections will be intermittently closed to all vehicular traffic during the period specified below:

From around 6.00 am to around 11.30 am on 19 December 2025

    1. Lo Lung Hang Street;
    2. Cheong Hang Road;
    3. On Ching Road;
    4. Winslow Street; and
    5. The session of Cheong Tung Road between Cheong Hang Road and Winslow Street.

From around 10.00 am to around 11.30 am on 19 December 2025

    1. Cheong Tung Road

        Suspension of Parking Spaces

The following parking spaces will be temporarily suspended from 5.00 pm on 18 December 2025 to 1.00 pm on 19 December 2025:

    1. Three metered parking spaces (nos. 7689B, 7690B and 7697A) on Cheong Hang Road near Cheong Hang Lane;
    2. Two metered parking spaces (nos. 7695B and 7696B) on Winslow Street near Baker Court;
    3. Three metered parking spaces (nos. 7692AB and 7691B) and one disabled parking space on On Ching Road; and
    4. 11 metered parking spaces (nos. 7647AB, 7648AB, 7649AB, 7676B, 7677AB, 7678AB) and two disabled parking space on Lo Lung Hang Street.

       Actual implementation of the road closure and traffic control measures will be determined by the Police at the time depending on the prevailing circumstances in the area. Motorists are advised to exercise tolerance and patience, and take heed given by the Police.