Notice is hereby given that to facilitate the construction works for the Development of Lok Ma Chau Loop, a section of fast lane of San Sham Road (flyover of cross-boundary passenger vehicles) southbound from a point about 550 metres north of its junction with Lok Ma Chau Control Point to a point about 400 metres north of the same junction will be temporarily closed to all vehicular traffic from 8.00 am on 16 March 2026 to 6.00 pm on 3 April 2026.
Appropriate traffic signs will be erected on site to guide motorists.
As it may take longer travelling time than usual in view of the temporary traffic arrangement, the public are advised to allow more time for their journeys to/from Lok Ma Chau Control Point and the areas in the vicinity.