Traffic Advice
Extension of Temporary Traffic Arrangement on Ping Che Road, North District


Motorists are advised that, to facilitate drainage works, the section of Ping Che Road from a point about 300 metres south of its junction with Lin Ma Hang Road to a point about 400 metres south of the same junction (near Ping Yuen River) will continue to be temporarily converted to one-lane two-way traffic from 8 a.m. on 15 April 2026 to 6 p.m. on 15 July 2026.

Appropriate traffic signs will continue to be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.