Members of the public are advised that in order to facilitate drainage works, the leftmost lane of Tai Po Road (Tai Wai Section) eastbound from a point about 185 metres west of its junction with Lion Rock Tunnel Road to a point about 45 metres west of the same junction will be temporarily closed to all vehicular traffic daily from 10 pm to 6 am of the following day on Mondays to Saturdays (except Public Holidays) during the period from 20 April to 31 August 2026.