Motorists are advised that to facilitate drainage works, the overnight goods vehicle parking spaces on the southern kerbside lane of Chun Cheong Street from a point about 27 meters west of its junction with Chun Kwong Street to a point about 94 metres west of the same junction will continue to be temporarily suspended from 6:00 pm on 15 April 2026 to 6:00 pm on 15 September 2026.
Appropriate traffic signs will be erected to guide motorists.