Traffic Advice
Extension of Temporary Traffic and Transport Arrangements on Sha Tau Kok Road – Wo Hang, North District


          Members of the public are advised that in order to facilitate drainage works, the following temporary traffic and transport arrangements will continue to be implemented on Sha Tau Kok Road – Wo Hang from 7.00 pm on 4 April 2026 to 7.00 pm on 20 April 2026:

(
1) LANE CONVERSION

A section of Sha Tau Kok Road – Wo Hang from a point about 104 metres east of its junction with the unnamed access road leading to Shek Kiu Tau Tsuen to a point about 134 metres east of the same junction will continue to be temporarily converted from two-lane two-way traffic into one-lane two-way traffic.

(2) PUBLIC TRANSPORT SERVICE ARRANGEMENTS

The bus stop on Sha Tau Kok Road – Wo Hang southbound near Yim Tso Ha will continue to be temporarily relocated. Details are as follows:

Routes Nos.

Direction

Temporary Arrangement

KMB Route Nos. 78, 78K, 78S, 277A and N78

Sheung Shui / Kowloon bound

Relocated about 15 metres northwards

          Appropriate traffic signs have been erected on site to guide motorists. The bus company will display notices to advise passengers of the above temporary arrangement.