Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Ching Hong Road from 9.00 p.m. to 6.00 a.m. of the following day daily on 28 April and 5 May 2026:
(I) Lane ClosurePart of the traffic lanes of Ching Hong Road northbound from its junction with Tsing Yi Road to a point about 90 metres north of the same junction will be temporarily closed to all vehicular traffic.
(II) Arrangement of GMB stops
Appropriate traffic signs will be erected on site to guide motorists. Notices will be displayed by the public transport operator to advise passengers of the above temporary arrangements.