Traffic Advice
Temporary Traffic Arrangement on North Lantau Highway

          Motorists are advised that in order to facilitate the construction works of Tung Chung New Town Extension – Tai Ho Interchange, with effect from 8:00 p.m. on 9 May 2026 to 7:00 p.m. on 10 May 2026, the following traffic lanes will be temporarily closed to all vehicular traffic:

  1. A section of slow lane and middle lane of North Lantau Highway westbound from a point with its junction with Shun Long Road northbound to a point about 300 metres west of the same junction; and
  2. A section of slow lane and middle lane of North Lantau Highway eastbound from a point with its junction with the slip road leading to MTR Siu Ho Wan Depot to a point about 300 metres east of the same junction.

          Motorists could make use of remaining traffic lanes of the above road sections during the period of the above lane closure.

          Appropriate traffic signs will be erected on site to guide motorists.