Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Ching Hong Road between 12.30 a.m. and 5.30 a.m. daily from 14 to 15 May 2026:
The traffic lane of Ching Hong Road westbound from a point about 100 metres east of its junction with Tsing Yi Road West to a point about 200 metres east of the same junction will be temporarily closed to all vehicular traffic.
(II) Lane Conversion
The traffic lane of Ching Hong Road eastbound from a point about 100 metres east of its junction with Tsing Yi Road West to a point about 200 metres east of the same junction will be temporarily converted into one-lane-two-way traffic.
(III) Arrangement of Bus Stops
Appropriate traffic signs will be erected on site to guide motorists. Notices will be displayed by the public transport operators to advise passengers of the above temporary arrangements.