Traffic Advice
Temporary Traffic Arrangements on Fanling Highway, North District
Motorists are advised that, to facilitate road works, the following traffic lanes of Fanling Highway (westbound) will be temporarily closed to all vehicular traffic from 1.00 a.m. to 5.30 a.m. on 22 May 2026:
- The two rightmost lanes of Fanling Highway westbound from a point about 40 metres west of its junction with Pak Wo Road Elevated Road (near North District Community Health Centre Building) to a point about 680 metres west of the same junction;
- The two leftmost lanes of Fanling Highway westbound from a point about 350 metres west of its junction with the slip road leading to Tai Tau Leng roundabout to a point about 690 metres west of the same junction; and
- The leftmost lane of Fanling Highway westbound from a point about 600 metres west of its junction with the slip road leading to Tai Tau Leng roundabout to a point about 1560 metres west of the same junction.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.