Members of the public are advised that to facilitate the road resurfacing works, the following traffic & transport arrangements will be temporarily implemented on King Ling Road, Tseung Kwan O:
A. Lane Closure
The following traffic lanes will be temporarily closed to all vehicular traffic from 10.00 pm to 6.00 am of the following day on the dates listed below:
|
Date |
Closed Lane |
|
1 & 2 June 2026 |
The section of slow lane on Tong Ming Street westbound from a point about 90 meters west of its junction with Tong Chun Street to a point about 250 meters west of the same junction. |
|
3 & 4 June 2026 |
The section of fast lane on Tong Ming Street westbound from a point about 10 meters west of its junction with Tong Chun Street to a point about 250 meters west of the same junction. |
Motorists can use the remaining traffic lane of the above road section.
B. Temporary Transport Arrangements
The following bus stops will be temporarily relocated from 10.00 pm to 6.00 am of the following day on the dates listed below:
|
Date |
Location of Bus Stop |
Details of Relocation |
Affected Routes |
|
1 & 2 June 2026 |
Tong Ming Street westbound near Tong Ming Street Park |
Relocate eastward for about 50 meters |
KMB Route Nos. 90, 290A, 290X, 296A, 296C, 296D, 296M, 296P, and N290 CTB Route Nos. 694, 694S, 792M, 795X, 796P, 796X, 798, A28, E22A, N29 and N796 Cross Harbour Route No. N691 |
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to drive with utmost care and patience.