Motorists are advised that, to facilitate the works of Airport Tung Chung Link, the following temporary traffic and transport arrangements on Tat Tung Road will be implemented from 10.00 a.m. on 30 June 2026 to 06.00 p.m. on 31 December 2026: -
Temporary Relocation of Motorcycle Parking Spaces
26 motorcycle parking spaces at Tat Tung Road near Fu Tung Street will be temporarily relocated. Among them, 16 spaces will be relocated for about 175 metres westward, while the remaining 10 spaces will be relocated to the area near the lay-by at Tat Tung Road outside Tung Chung Station Exit A.
Temporary Relocation of Bus Stop
|
Affected Route No. |
Details |
|
Citybus Route Nos. E11, E11A, E11B, E21, E21B, E23, E23A, N11, N21 and N21A; Long Win Bus Route Nos. E31, E32, E42, E43, N31; and New Lantao Bus Route Nos. 3M, 11, 11A, 34, 36, A35 and N35 |
The bus stop outside Fu Tung Plaza will be relocated westward about 6 meters |
|
Citybus Route Nos. E22 and E22A; and Long Win Bus Route Nos. E31, E41 and E43 |
The bus stop opposite to Citygate will be cancelled while passengers could still board the buses at the temporary bus stop outside Fu Tung Plaza |
|
New Lantao Bus Route No. 36 |
The bus stop opposite to Citygate will be cancelled while passengers could still board the buses at Tat Tung Road Bus Terminus |
Appropriate traffic signs will be provided on site to guide motorists.
The bus companies will display notices to advise passengers of the above temporary arrangements.